Carrier Chiller Installation September 2005

 

Chiller installation for Carrier Chillers this was the installation of one 800Kw and one 500Kw chillers used to provide chilled water for the Printing Presses, and also for the factory air conditioning total cost of the equipment £130,000

Harris M600 Lithographic Press Installation Heidelberg

New factory for Quebecor World October 2004 - Moore Electrical was the principle contractor for the Electrical installation.

bulletTwo Harris M600 Presses
bulletFactory Lighting
bulletHV & LV Switch rooms new switch room added to factory to provide an extra 1500 KVA
bulletPlant room panels for the control of cooling towers, water pumps and pollution equipment

Megtec Enterprise Afterburner

New Regenerative Afterburner state of the art pollution control required for many industries to comply with the Governments 1990 Environmental Protection Act.

bulletInstallation of Electronic inverter drives for motors
bulletExtension to existing LV panels to accommodate the extra load
bulletSpecialist cabling for Electronic control, all data and power cables must be separated

 

 

Home | Health & Safety | Contracts-2007 | Contracts-2008 | Technical Information | Service Request | Suggestions | Catalogs / Manuals | Customer List | CDM Regulations | Equipment Surveys

Questions or problems regarding this web site should be directed to [john@mooreelect.co.uk]
Copyright © 2003 [Moore Electrical Services]. All rights reserved.
Last modified: 03 July 2009.